Installation Engineer / Specialist at Fortis Engineering Services

Confidential

Lagos, Nigeria CDI

Publiée il y a 1 mois · Expire dans 3 semaines

Partager :

Description du poste

## Title: Installation Engineer - Subsea & Topside Systems

Purpose

The Installation Specialist reports to the Bonga North Offshore Construction Lead and is responsible for delivering the Bonga North Topsides scope and tie-in activities. This role ensures best-in-class HSSE and CAPEX performance, achieving safe and flawless start-up (zero leaks) and safe, reliable operations of the asset post start-up.

Project Overview

The Bonga North Project involves the development of new reservoirs through a 16-well tie-back (8 producers and 8 injectors) to the existing Bonga Main FPSO with a 15-year life extension. The project targets approximately 352 MMboe recovery with associated subsea infrastructure and topside revamp scope.

Scope of Work

Subsea Infrastructure (SURF Scope):

  • 8 subsea production trees and 8 water injection trees
  • 2 x 4-slot production manifolds, 4 x 1-slot production inline tees
  • 1 x 6-slot and 1 x 2-slot water injection manifolds, 1 x 1-slot water injection inline tee
  • 8 production jumpers and 8 water injection jumpers
  • 10" production flowlines (approximately 26 km) with steel catenary risers (SCRs) in two flow loops
  • 14" water injection flowline (approximately 12 km) with SCR
  • Approximately 32 km of static and dynamic umbilical and 4 km of composite gas-lift umbilical for subsea and well facilities services and control

Topside Modifications:

  • Engineering, procurement, fabrication, and installation of topside equipment modifications and upgrades
  • Total additional dry weight: approximately 1,500 metric tonnes
  • Installation of one new water injection turbine-driven pump
  • Upgrade of one existing Bonga Main pump
  • Addition of four new electric motor-driven methanol injection pumps
  • Addition of two corrosion inhibitor pumps
  • Multiple tie-ins to existing systems

Project Timeline

The project targets achievement of Final Investment Decision (FID) in 2024 and Final Operations Decision (FOD) in 2027/2028.

Career Growth Opportunity

This position offers a significant opportunity for career growth within a major offshore development project.

Ce poste vous intéresse ?

Se connecter pour voir l'email

Pas encore inscrit ? Créer un compte gratuit