Construction Engineer, Offshore at Fortis Engineering Services

Confidential

Lagos, Nigeria Permanent

Published 1 month ago · Expires 2 weeks from now

Share :

Job description

## Title: Offshore Construction Engineer

About the Role

A reputable organization seeks a dedicated Construction Engineer to join its offshore operations team. You will report to the BN Principal Construction Engineer and be responsible for delivering the Bonga North Topsides scope and tie-in activities. Your primary focus will be ensuring safe and flawless execution beyond best-in-class HSSE and CAPEX performance, achieving zero leaks during start-up, and ensuring safe and reliable operations post-commissioning.

Project Overview

The Bonga North Project represents a significant development initiative involving new reservoir development through a 16-well configuration (8 producers + 8 injectors) tied back to the existing Bonga Main FPSO with a 15-year life extension. The project targets approximately 352 MMboe recovery with comprehensive subsea infrastructure and topside revamp scope.

Project Scope: Subsea (SURF)

The subsea scope includes:

  • 8 subsea production trees and 8 water injection trees
  • 2 x 4-slot production manifolds, 4 x 1-slot production inline tees
  • 1 x 6-slot water injection manifold, 1 x 2-slot water injection manifold, 1 x 1-slot water injection inline tee
  • 8 production jumpers and 8 water injection jumpers
  • 10" subsea production flowlines and steel catenary risers (SCRs) across two flow loops (approximately 26 km)
  • 14" water injection flowline and SCR (approximately 12 km)
  • Approximately 32 km of static and dynamic umbilical systems
  • Approximately 4 km of composite gas-lift umbilical

Project Scope: Topsides

Bonga Main FPSO modifications include engineering, procurement, fabrication, and installation of equipment upgrades with a total additional dry weight of approximately 1,500 metric tonnes (MT). Upgrades involve:

  • Installation of one new water injection turbine-driven pump
  • Upgrade of one existing Bonga Main pump
  • Addition of four new electric motor-driven methanol injection pumps
  • Addition of two corrosion inhibitor pumps
  • Multiple tie-ins to existing systems

Project Timeline

  • Final Investment Decision (FID): 2024
  • Final Commissioning (FOD): 2027/2028

Key Accountabilities

The Construction Engineer is accountable for delivering the assigned scope in line with project objectives and organizational standards.

Interested in this job?

Log in to see the email

Not registered yet? Create a free account