Installation Engineer / Specialist at Fortis Engineering Services

Fortis Engineering Services

Lagos, Nigeria Permanent

Published 1 month ago · Expires 3 weeks from now

Share :

Job description

## Title: Installation Engineer – Offshore Topsides

About the Role

This position offers a great opportunity for career growth. The Installation Specialist reports to the BN Offshore Construction Lead and is responsible for delivering the Bonga North Topsides scope and tie-in operations. You will ensure best-in-class HSSE and CAPEX performance, safe and flawless start-up (zero leaks), and safe and reliable operations of the Asset post start-up.

Project Overview

Bonga North Project: Development of new reservoirs through a 16-well tie-back (8 producers + 8 injectors) to the existing Bonga Main FPSO with a 15-year life extension, targeting approximately 352 MMboe with associated subsea infrastructure and topside revamp scope.

Subsea Scope (SURF)

  • 8 subsea production trees and 8 water injection trees
  • 2 production manifolds (4-slot each), 4 production inline tees (1-slot each)
  • 2 water injection manifolds (6-slot and 2-slot) and 1 water injection inline tee (1-slot)
  • 8 production jumpers and 8 water injection jumpers
  • 10" subsea production flowlines (approximately 26 km) and steel catenary risers (SCRs) in two flow loops
  • 14" water injection flowline (approximately 12 km) and SCR
  • Approximately 32 km of static and dynamic umbilical and approximately 4 km of composite gas-lift umbilical for subsea and wells services and control

Topsides Modifications

Topsides modifications on Bonga Main FPSO include engineering, procurement, fabrication, and installation of materials and equipment with a total additional dry weight of approximately 1,500 metric tonnes (MT).

Topside Upgrade Scope:

  • Installation of one new water injection turbine-driven pump
  • Upgrade of one existing Bonga Main pump
  • Addition of four new electric motor-driven methanol injection pumps
  • Addition of two corrosion inhibitor pumps
  • Several tie-ins to existing systems

Project Timeline

  • Final Investment Decision (FID): 2024
  • Final Operations Date (FOD): 2027–2028

Location

Lagos, Nigeria

Interested in this job?

Log in to see the email

Not registered yet? Create a free account