Tradesperson 1 – UG HV Electrical
AngloGold Ashanti Geita Gold Mine
Publiée il y a 1 semaine · Expire dans 1 mois
Description du poste
About Geita Gold Mining Ltd
Geita Gold Mining Ltd (GGML) is Tanzania's leading gold producer with a single operation in Geita Region. The company is a subsidiary of AngloGold Ashanti, an international gold producer headquartered in South Africa, with operations in more than ten countries across four continents. The mine is situated in the Lake Victoria Gold fields of Northwestern Tanzania, approximately 85 km from Mwanza City and 20 km southeast of Lake Victoria. The company's head office is located in Geita, 5 km west of the town of Geita, with a supporting office in Dar es Salaam.
Position Overview
Title: Tradesperson 1 – UG HV Electrical
Department: Engineering
Location: Geita Gold Mine, Tanzania
Employment Status: Permanent, Full-Time
Role Objective
To effectively manage electrical maintenance activities at underground operations, including underground electrical reticulation systems, dewatering facilities, camp facilities and infrastructure, overhead power lines, power generation, medium voltage tasks, and ventilation systems.
Key Responsibilities
- Maintain and repair high-voltage electrical systems
- Perform fault diagnosis and troubleshooting
- Conduct preventive and breakdown maintenance
- Ensure compliance with safety and electrical standards
- Assemble and install electrical and electronic systems in equipment
- Perform routine maintenance on machinery to ensure maximum output according to design specifications
- Cooperate with all stakeholders and assist in coordinating electrical works
Ce poste vous intéresse ?
Se connecter pour voir l'emailPas encore inscrit ? Créer un compte gratuit
Pas encore inscrit ? Créer un compte gratuit